IntelChiefRiver

Latest

  • MSI unwraps Slider S20 hybrid tablet with Windows 8 (hands-on)

    by 
    Jon Fingas
    Jon Fingas
    06.04.2012

    MSI is well-known for showing tablets at Computex -- it even showed what amounts to the same tablets at two different shows. It's certainly shaking things up this year, however, with the Slider S20. We've seen hybrid tablet PCs before, but the Windows 8-toting S20 has a fairly slick tilting mechanism that locks the 11.6-inch touchscreen at an angle, turning the slate into a pseudo-laptop right on the spot. MSI is only willing at this early stage to mention a few key details, but it's promising at least one Slider S20 variant with a properly speedy low-voltage Ivy Bridge chip as well as 4GB of RAM, Bluetooth 4.0, HDMI and USB 3.0. Our friends at Engadget Spanish got an early look and found the tablet a bit chunky with a so-so display, but also thought that it looked like a "robust" design. Check our overseas companions' first impressions for more, and know that the Slider S20 is expected to reach Europe in September at €899 ($1,121) in its full Ivy Bridge glory along with a lower-powered model at €799 ($996).%Gallery-156804%

  • Intel Chief River laptop platform to support USB 3.0, arrive in 2012?

    by 
    Joanna Stern
    Joanna Stern
    11.03.2010

    Another Intel processor platform that sounds like a campground? Of course it is! This one is pretty far out -- like 2012 far out -- but if Digitimes is to be believed Intel's actually gearing up to reveal its Chief River laptop platform at CES in January. Said to be based on the 22nm Ivy Bridge processors and have native support for USB 3.0 (finally!), the platform would follow Huron River / Sandy Bridge, which is set to start shipping in laptops in early 2011. (Side note: Digitimes also mentions that we should start seeing Sandy Bridge laptops at this year's CES, which lines up with what we've heard from our own sources.) The word from motherboard manufacturers is that Chief River wouldn't actually go into mass production until September 2011 and start shipping in systems until January 2012, which makes quite a bit of sense given Intel's annual timing on these things. Either way, we should be finding out more in a couple months in Vegas -- heck, you never know, Intel may even tell us a bit about its 2013 laptop platform. Shall we give them a hand with potential names?